• Votes

    6

    PickingComplete Flag incorrectly set to No

    The PickingComplete flag in tsoShipLine needs to be manually set to Yes (1) when creating a pick sporadically. Would like to see this stop happening or a menu item to ...

  • Votes

    13

    Allow entry in "maintain vendor items" for all item types

    Currently you can only add vendor price breaks for item type "finished goods" or "raw material". We buy plenty of re-occurring non-inventory items with item type "misc" ...

  • Votes

    4

    Enhance advanced manufacturing backflush to prompt for override of ...

    Currently if material has been manually issued to a work order and the step marked as complete, the progress or labor step will re-issue the material to the work order ...

  • Votes

    1

    V7.4 - All the explorers can not load the default argument settings at ...

    eEvery has his

  • Votes

    5

    EXPLORER - STOCK STATUS IN V7.4 IS TOO SLOW, THE RESPOND TIME IS 30 ...

    We just upgraded to V7.4, but we found the respond time of STOCK STATUS EXPLORER is too long, it took 30 seconds compare to the others (excluding ITEM EXPOLORER) within 2 ...

  • Votes

    8

    Provide a streamlined BOM regeneration process capable of updating the ...

    While material ID's can be readily added, changed or deleted in routing maintenance, that operation does nothing to update the bill of material. Clicking the BOM button ...

  • Votes

    5

    Allow item maintenance to track item/part revision number/letter.

    During the process of developing new products, we have parts that undergo various revisions during their life. At various times, purchasing must buy parts of differing ...

  • Votes

    8

    Add scrap postings and scrap posting accounts

    When entering scrap quantities during a labor step there should be an option to generate scrap postings in the GL for these entries. The entry to scrap would be the ...

  • Votes

    3

    Specify Labor Posting account at operation level or at least provide ...

    Manufactures often track labor by the operation being performed. Currently these accounts are set at the mfg item class. So if it takes five operations to produce a ...

  • Votes

    10

    Scrap percentages at component level

    Need the ability to enter scrap percentage at the component level that affect only that component. Currently scrap % can only be set at the labor step and it is ...

  • Votes

    4

    Seperate Qty precision for manufacturing modules

    Manufactures often use components at hich levels of decimal precision(s) .00235 units of a component but never purchase/sell items at 5 decimals. Customer should be ...

  • Votes

    13

    Allow the usage/issue of materials in various UOMs.

    Currently the routing defaults material to the stocking UOM. The system should allow the user to dictate the UOM (Any valid UOM from the conversion list) the material ...

  • Votes

    6

    Add the ability to fill text in the notes box for Progress Entry ...

    the notes box is available but text cannot be entered. It would be useful to be able to enter a reason for a progress return.

  • Votes

    10

    In MRP, do not consider current period Projected Demand if Start Date ...

    On the 'Options' tab in MRP, a Start Date must be set to identify the beginning of the MRP plan you are creating/running. If this date is set to a date in a future ...

  • Votes

    4

    Multiple quotations

    Necessary to relate/map multiple quotations to a Work Order since we have modifications and or improvements during the production process that need to be ...

  • Votes

    3

    Shift premiums

    Possibility of having more than just 3 logical shifts in order to link them to a group of employees within a shift with different attributes such as nightshift or ...

  • Votes

    6

    Cost allocation for multitasking employees

    Although MAS500 allows employees to log into multiple work orders and machines at the same time, the labour hours and cost do not split. Instead, the hours and hourly ...

  • Votes

    6

    Add the ability to split employee cost when they are signed into more ...

    When an employee is signed into multiple work orders, the system currently calculates using the run hrs * employee rate, thus overstating the cost. If they are signed in ...

  • Votes

    5

    Make Serial Number Mask/Generation warehouse specific

    Most times a serial number mask will include a designator for production location. The current MAS500 serial number mask is global. It needs to be at the warehouse ...

  • Votes

    10

    MRP / IR should be able to automatically set up PO's based on a ...

    We have ReDistribution business that orders in Truckload quantities. We would like IR / MRP to create PO's based on a standard order size (truckload). Each truckload ...