• Votes

    13

    Improved tracking of Outside Processing (farm-out work).

    We have situations where we take components issued to a work order and send them out to a Vendor for machining/processing/testing. We accomplish this through the use of ...
  • Votes

    16

    Add the ability to delete a routing

    You should be able to delete a routing after deleting the work orders.
  • Votes

    14

    Material Scrap Improvement

    During our production process, some raw components of the produced item get scrapped while other raw components get reused. The current scrap process within MAS 500 only ...
  • Votes

    2

    Sort the MRP planned orders report by MRP Setting name

    Back on SQL 2000 the MRP planned orders report MRP setting drop down used to sort by MRP version. Due to an index change with SQL 2005 the report no longer sorts in any ...
  • Votes

    17

    Add a checkbox in MRP to allow for the exlusion of safety stock

    Sometimes you want to run MRP and just see what you need to make to get by and not see all of the items that are below their safety stock. Simply add a checkbox to the ...
  • Votes

    7

    Scheduling cannot schedule multiple jobs on the same machine ...

    Some of our machines are setup to run multiple parts at one time. Each part will of course have its own work order and the employee is logged into each. So at the end ...
  • Votes

    4

    Scheduling does not have an employee constraint

    We have more machines then employees. Currently, if 10 machines can run a part it will assume that all ten machines will be running. If, however, we only have 5 ...
  • Votes

    4

    Allow WOs to be grouped together for material issues.

    We are a cut and sew operation that will nest a dozen or so WOs together for fabric utilization. I would like to be able to issue the total material used across all WOs ...
  • Votes

    5

    Include notes when using the "send email upon finish and exit" option ...

    Each approval line can have notes entered with it. We would like to see those notes included in the email sent when using the "send email upon finish and exit" option. ...
  • Votes

    20

    MRP needs to be able to look at Blanket Sales Orders

    MRP currently does not look at blanket orders. When you are dealing with raw materials that have a long lead time and large minimum runs, blankets are required to secure ...
  • Votes

    9

    Packing Slips for Mulitple Items

    There needs to be a way to combine all shipments on to one packing slip document. If multiple items are physically shipping out on one truck, multiple packing slips must ...
  • Votes

    3

    Break Time Codes by Department

    Add the ability to set up break time codes by department in Manufacturing under Labor Set Up. Presently, there is no department selection abilility in the "Set Up Break ...
  • Votes

    4

    The ability to specify a particular step to trigger back flushing

    Current functionality is that when a step is flagged for back flushing, the next labor step triggers the back flush. Our manufacturing department would like the ability ...
  • Votes

    7

    project accounting

    Have the ability to see comments entered in Purchase Orders with Projects to flow through to project accounting. Have the ability to view the Invoice and Purhcase Order ...
  • Votes

    8

    Physical inventory transaction

    Physical inventory transaction should be able to add back a serialized item that was physically counted out earlier.
  • Votes

    11

    Allow one warehouse to carry standard cost for multiple warehouses

    Add ability to associate warehouses similar to the MRP Consolidate Warehouses screen. For example, this would indicate that warehouse A would be used in all costing ...
  • Votes

    3

    All on the fly step entries or issues without item being on original ...

    In standard MAS 90/200 you are able to issue materials/costs/labor etc. without the material/issue/labor every being on the original work order. In 500, the step first ...
  • Votes

    5

    Manufacturing material returns processed at original cost tier values ...

    The ability to return items that have been issued to a work order at their original cost bucket values and dates. This should be functional for items using any tracking ...
  • Votes

    21

    Would like to see commitment by Sage to the Project Accounting Module

    The Project Accounting module seems to be an after thought with not much in the area of increased functionality. A basic needed change is full integration into Sales ...
  • Votes

    6

    Allow for building a bill of materials with drag and drop ...

    When entering a Bill of Materials, you build it in the routing. You see the BOM in a visual manner with the indentations and color. At this time, the ability to add, ...