• Votes

    5

    Multi-site cost roll-ups

    When running a multi-plant environment, where sub-assemblies are prduced i na different site than the finished goods, the cost calculation process is quite arduous. You ...
  • Votes

    4

    BOM/Kit Dynamic Cost Update

    When an Active product is updated to a Not Usable status, it would be great if X3 could prompt the user to decide whether or not the user would like this change to impact ...
  • Votes

    7

    delete production tracking

    Prior to V6.5 patch 28 we could simply delete entire production tracking records with the press of the Delete button. Or we could delete individual lines by ...
  • Votes

    2

    Product Lot control by site

    It would be great if we could set at Site Level the configuration/parametrization about lot control and product traceability. We have 2 sites in our organization that 1 ...
  • Votes

    4

    CRITICAL-MRP to take into account expire dates for Short Shelf Life ...

    CRITICAL REQUIREMENT FOR THE FRESH FOODS INDUSTRY YOU ARE TRYING TO PENETRATE .... MRP not taking into account expiration date on POS – purchase order suggestions. The ...
  • Votes

    2

    Scheduling: Parameterize inclusion of Nonproductive time

    When using backward scheduling (which is a must for our company) any of the times in the Off time charge block of operation detail (Prep, Wait and Post Op Times) are not ...
  • Votes

    8

    BOM additions function

    We need a function in X3 that is similar to the replace or delete component, but will add a new item to multiple BOMs based on a selection criteria. We have the case ...
  • Votes

    1

    Each QC line Comment Option

    After QC request generate with X qty from that X-1 is Rejected and rest is approved . Really helpful if we have option to give on each line for approval/Rejection.
  • Votes

    1

    Expand the number of lot compliment fields

    At present the system allows for four lot compliment fields (User Field 1, User Field 2, Rubrique 3c and Rubrique 4d. It would be helpful if this number could be ...
  • Votes

    2

    Customer Specific Quality Records (i.e. Technical Sheets)

    It is common in the chemical processing industry that an organization will have their own technical sheets against which they evaluate the QC status on the lots that are ...
  • Votes

    4

    Better overrall management of Multi-output Work Orders

    It is possible to create a Work Order with multiple outputs, but there are a lot of shortcomings. For example, there is very little, if no possibilities of defining the ...
  • Votes

    4

    Allow Stock Label printing from ADC Production Reporting VXAPT

    The current ADC functionality in Production Reporting supresses any transaction set Stock Label = YES.
  • Votes

    1

    Remove control on total link quantity for By-products in BOM expressed ...

    If a BOM is expressed as a %, there is a control in place to avoid entering the total link quantity greater than 100%. However, this control also includes any ...
  • Votes

    5

    Firming up MRP result from Planning Workbench table (grid)

    Currently to firm up MRP result on either Enterprise Planning or Planning Workbench, the user has to right click on the line and click to another function to create the ...
  • Votes

    16

    Easier Way to Update Work Order Components/Routing

    When a work order is created, the system takes the BOM and Routing at the time, and put on the work order. However, sometime the BOM/routing got changed before the Work ...
  • Votes

    6

    BOM Maintenance - Screen Transaction Code Control

    The BOM function in X3 supports many different business types and industries. Because of this the number of fields required during the entry of a component/ingredient ...
  • Votes

    12

    Add an MSDS module or MSDS capabilities to Sage ERP X3

    Would like to be able to create MSDS technical sheets and have other capabilities. One recommendation is to somehow integrate the Sage PFW MSDS module with Sage ERP X3.
  • Votes

    5

    Validity Date for Part Number to Automatically Obsolete

    Currently there's a validity date for BOM components. When Engineering phasing out a component with a replacement, they put a expected phase out date on the the "Valid ...
  • Votes

    21

    ability to deactivate work center

    There needs to be a way of marking a Work Center as inactive. The only way to prohibit a user from not using a work center on a routing is if it doesn't exist. If we've ...
  • Votes

    9

    Miscellaneous Work Orders

    Sometimes there are tasks to be done by some work centers that are not product related. It could be maintenance, or it could be a prototype run for the engineer. These ...