• Votes

    4

    ADC: Support for non-terminal devices

    The ability to run ADC transaction on non-terminal devices is desired. Today, you have two choices. 1) Terminal based (ASCII) interface 2) Sage ERP X3 GUI/Web client ...
  • Votes

    5

    Customer Specific Product - Private Labeling

    Would like a better way to manage customer specific products under a generic product ID. For example, they have a common hand soap that is private labeled for multiple ...
  • Votes

    6

    Crystal Report for the Assembly function

    The Assembly (GESBBY) function does not have a crystal report that reflects what has been made and consumed based on the assembly operation. A report such as this would ...
  • Votes

    5

    Allow unexpected material more than ones on Work Orders just like ...

    In X3 BOM's you have the ability to add the same item more than once based on routing sequence so paperwork can show how much is needed per operation. Yet on work orders ...
  • Votes

    2

    Editable product ID in work order screen

    When the only or first product on a WO is incorrect, it must be deleted & re-added. It cannot be edited. The delete & re-add does not re-use the 1000 value of the ...
  • Votes

    5

    Create a Work Order from a Sales Order and Maintain a Link

    All manufacturers have situations where they need to run a job specifically for a customer’s order. This is true even for manufacturers who are not typically job shop. ...
  • Votes

    2

    BOM to Routing Tunnel for Standard Routings with Multiple sites

    We discovered in V5 and still in V6 for products that are setup at two sites and use a standard routing (defined on Product Site), when you try to use the Routing button ...
  • Votes

    3

    Formula Management and Percentages

    When specific gravity or density is being used to manage mixed UOM (weight/volume) formulas, additional fields are needed to assist the formulator. Each ingredient ...
  • Votes

    8

    Manufacturing component substitution

    Earlier version of Sage ERP X3 (pre-v6) had a feature that allowed you to define a list of substitute or replacement products on the product record. This list of ...
  • Votes

    1

    Operations Tracking: Quantity default in Tracking

    When tracking an operation, the entry would be simplified if the operation quantity defaulted from the quantity tracked at the previous operation less any quantity ...
  • Votes

    2

    Production Tracking Quantity Breakdown

    There are industries the quantity being processed will be broken down at an operation. This is similar to a child lot size. It might be dictated by equipment or simply ...
  • Votes

    3

    BOM/Kit Dynamic Cost Update

    When an Active product is updated to a Not Usable status, it would be great if X3 could prompt the user to decide whether or not the user would like this change to impact ...
  • Votes

    4

    Better overrall management of Multi-output Work Orders

    It is possible to create a Work Order with multiple outputs, but there are a lot of shortcomings. For example, there is very little, if no possibilities of defining the ...
  • Votes

    4

    Multi-site cost roll-ups

    When running a multi-plant environment, where sub-assemblies are prduced i na different site than the finished goods, the cost calculation process is quite arduous. You ...
  • Votes

    4

    Allow Stock Label printing from ADC Production Reporting VXAPT

    The current ADC functionality in Production Reporting supresses any transaction set Stock Label = YES.
  • Votes

    6

    delete production tracking

    Prior to V6.5 patch 28 we could simply delete entire production tracking records with the press of the Delete button. Or we could delete individual lines by ...
  • Votes

    4

    CRITICAL-MRP to take into account expire dates for Short Shelf Life ...

    CRITICAL REQUIREMENT FOR THE FRESH FOODS INDUSTRY YOU ARE TRYING TO PENETRATE .... MRP not taking into account expiration date on POS – purchase order suggestions. The ...
  • Votes

    2

    Scheduling: Parameterize inclusion of Nonproductive time

    When using backward scheduling (which is a must for our company) any of the times in the Off time charge block of operation detail (Prep, Wait and Post Op Times) are not ...
  • Votes

    8

    BOM additions function

    We need a function in X3 that is similar to the replace or delete component, but will add a new item to multiple BOMs based on a selection criteria. We have the case ...
  • Votes

    1

    Each QC line Comment Option

    After QC request generate with X qty from that X-1 is Rejected and rest is approved . Really helpful if we have option to give on each line for approval/Rejection.