• Votes

    6

    delete production tracking

    Prior to V6.5 patch 28 we could simply delete entire production tracking records with the press of the Delete button. Or we could delete individual lines by ...
  • Votes

    4

    CRITICAL-MRP to take into account expire dates for Short Shelf Life ...

    CRITICAL REQUIREMENT FOR THE FRESH FOODS INDUSTRY YOU ARE TRYING TO PENETRATE .... MRP not taking into account expiration date on POS – purchase order suggestions. The ...
  • Votes

    2

    Scheduling: Parameterize inclusion of Nonproductive time

    When using backward scheduling (which is a must for our company) any of the times in the Off time charge block of operation detail (Prep, Wait and Post Op Times) are not ...
  • Votes

    8

    BOM additions function

    We need a function in X3 that is similar to the replace or delete component, but will add a new item to multiple BOMs based on a selection criteria. We have the case ...
  • Votes

    1

    Each QC line Comment Option

    After QC request generate with X qty from that X-1 is Rejected and rest is approved . Really helpful if we have option to give on each line for approval/Rejection.
  • Votes

    1

    Expand the number of lot compliment fields

    At present the system allows for four lot compliment fields (User Field 1, User Field 2, Rubrique 3c and Rubrique 4d. It would be helpful if this number could be ...
  • Votes

    2

    Customer Specific Quality Records (i.e. Technical Sheets)

    It is common in the chemical processing industry that an organization will have their own technical sheets against which they evaluate the QC status on the lots that are ...
  • Votes

    1

    Enhance Multi-level routings screen to include online help

    The Manufacturing > Technical data > Routings > Multi-level routings screen (VISUROUG) does not contain any help. Please enhance the screen to include help.
  • Votes

    2

    ADC transactions -- change order of entry

    ADC transaction entry doesn't follow a logical sequence -- drilling down from field to field from general to specific. Looking at the transactions in ADC, it would seem ...
  • Votes

    1

    Scheduling: Ability to schedule a work center by person and shift

    Scheduling should allow a work center to be scheduled by person and shift. This would allow for the management of machine operators. In addition to the operator and ...
  • Votes

    7

    Scheduling: Ability to define additional constraints for use by the ...

    The graphical scheduler is a terrific tool but it needs to be more flexible in allowing the user to define additional constraints. Idea Origin: Sage Summit - C-0179 ...
  • Votes

    2

    Production Tracking: Ability to view work instructions from within ...

    Ability to view routing or work instructions from within the tracking function is needed. Currently, the user has to open another or secondary session to view. Idea ...
  • Votes

    2

    Technical Sheets: Response Copy Option

    When you have multiple work orders associated with the same batch (ex: pack out of bulk material), it would be very helpful if you could copy the technical sheet ...
  • Votes

    4

    Technical Sheets: Mass Validation Option

    Technical sheets share the same questions and responses but are validated individually. If you change a shared elements (like a default response) you should be able to ...
  • Votes

    11

    Product Supercession/Phase Out based on Stock Availability

    Ability to switch to alternate materials based on stock availability. They don't want to change until they consume/use all of the existing product so a date trigger is ...
  • Votes

    1

    Remove control on total link quantity for By-products in BOM expressed ...

    If a BOM is expressed as a %, there is a control in place to avoid entering the total link quantity greater than 100%. However, this control also includes any ...
  • Votes

    5

    Firming up MRP result from Planning Workbench table (grid)

    Currently to firm up MRP result on either Enterprise Planning or Planning Workbench, the user has to right click on the line and click to another function to create the ...
  • Votes

    16

    Easier Way to Update Work Order Components/Routing

    When a work order is created, the system takes the BOM and Routing at the time, and put on the work order. However, sometime the BOM/routing got changed before the Work ...
  • Votes

    6

    BOM Maintenance - Screen Transaction Code Control

    The BOM function in X3 supports many different business types and industries. Because of this the number of fields required during the entry of a component/ingredient ...
  • Votes

    12

    Add an MSDS module or MSDS capabilities to Sage ERP X3

    Would like to be able to create MSDS technical sheets and have other capabilities. One recommendation is to somehow integrate the Sage PFW MSDS module with Sage ERP X3.