• Votes

    6

    Report Screens

    Need ability to have more than 1 print screen open at a time. Very cumbersome and time consuming to go back and forth.
  • Votes

    6

    3-5 Jobs

    In the AR Invoices tab where all the job related invoices are listed, list the job on the report in the upper left corner.
  • Votes

    6

    Vendor list per project

    We just switched to Sage. We would like to produce a report for our field staff that lists each vendor (who we have entered in a PO or subcontract) PER PROJECT, with ...
  • Votes

    6

    Ability to add numbers together in a grid like you can in Excel

    If you highlight numbers in a grid, you should be able to see the sum of those number, just like in Excel. I've used other construction software programs that have these ...
  • Votes

    6

    4-2 Option to auto fill vendor number and job number when entering ...

    4-2 Option to auto fill from the last invoice entered the vendor numbers and/or job numbers when entering multipliable invoices for the same vendors and/or jobs.
  • Votes

    6

    Better descriptions in accounting report 2-4-21

    When you print this report, it shows generic descriptions of the GL entries from the various modules. Is it possible to use the same (or combined) description(s) used in ...
  • Votes

    6

    Enter multiple technicians under dispatch/work orders

    Would be nice to have the option to enter 2 or 3 technicians under dispatch in work orders. Right now can only enter 1 technician. Sometimes there are two or 3 ...
  • Votes

    6

    In 5-2-1, the salary field should be the annual salary, not the per ...

    The salary field should be for the annual salary amount, no per pay period and the program should then figure out the per pay period salary amount based on the pay ...
  • Votes

    6

    Please return the drive window!

    Once again, after updating to 19.5.27 I am forced to go around and remove the report forms folder from many users. I save as shared but if the user has one locally the ...
  • Votes

    6

    Change basic check all check report forms

    The basic check “report form” has some issues as well. 1. The piece pay only shows a lump sum, rather than the # of pieces and the rate. I feel that there is the space to ...
  • Votes

    6

    In 6-1-8 Allow Bonding Report to be run by Period “between”.

    Our bonding company wants a list of all jobs completed since the last bonding report we sent them. I need to run the report by Period “between”, which is not an option. ...
  • Votes

    6

    3-6 Job list sort columns

    When you look up a job from the 3-6 screen, it should allow you to add columns so you see the customers job number to make sure you are pulling up the right job.
  • Votes

    6

    Select certified payroll by phase

    In 3-5 Job you can check box to Require Cert PR. We also use Phase, to distinguish between work onsite or off. Employees may work both onsite and off, so excluding from ...
  • Votes

    6

    6-6-1 Overwriting a record# with same PO#

    In v19.8 if I needed to change the vendor or other field from a saved PO, I was able to Copy and Paste the PO, make the necessary changes, and then type in manually the ...
  • Votes

    6

    Service WO column in daily field reports

    Please add a WO # column in the daily field reports GRID so that people can attach some of their time directly to a service WO that is being assigned to that job. Right ...
  • Votes

    5

    Closed Posting Period Password

    It would be nice if the Admin can enter a password to update a record that is in a closed period. Currently, we have to open the period for ALL USERS and that is an ...
  • Votes

    5

    Need email address defaults by module not one for entire program

    In V20 it appears that all emails sent through the program are sent from the default email setting. Despite setting default emails in various modules, and experimenting ...
  • Votes

    5

    A/P Due date 60DY from end of month

    Example - Invoice date is 5/9/24 and my due date is 60 days from the last day of the month. SO, due date is not 30th or 60dy, it is 60dy from 5/31/24. Not sure how to ...
  • Votes

    5

    3-10-2 Compute T&M by Date Range

    We use the 3-10-2 Compute feature frequently but would like to request a new report format. We need to run a compute by a date range of payroll to capture the days an ...
  • Votes

    5

    Allow Accessibility settings to carry through updates

    I have a user that is significantly disabled with sight. He has to raise the fonts in Sage in order to work. However, after he updates Sage, all of his accessibility ...