-
Votes
6
Ship & Cancel For Customers/Vendors
90% of our customers are Ship & Cancel. But because we hold backorders for a few, we can't turn off Backorders on the item level. It would be a great time saver to have ...by: Mickey W. | over a year ago | Last activity over a year ago | Status changed over a year ago | Sales & Distribution
-
Votes
11
BOM Disassembly to correctly disassemble Serial Items
when you disassemble a serial item, it does not matter if you choose 'Produced Item" or "Production Reversal", the disassemble does not read from production history and ...by: Mickey W. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
7
Be Able To Generate Commission Reports Based on Orders Placed
Currently you can only run commission reports based on items that have already shipped. We would like to be able to run commission reports based on the orders that are ...by: Christy A. | over a year ago | Last activity over a year ago | Status changed over a year ago | Sales & Distribution
-
Votes
6
Run Reports Based on Year to Date or Multiple Year Usage for an ...
It would be very helpful if we could run reports that would show year to date usage (sales, builds, etc.) for any given part # at any time. Better yet the option to see ...by: Christy A. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
5
BOM allow option to specify using component default warehouse when ...
I have a client that opted to use warehouses instead of purchasing Multi/Bin. They have created several Warehouses for different areas within one physical warehouse. ...by: Tracey B. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
6
VI Import Shipping Data Entry with Batches on
When Importing SO Invoices you can import Shipping Data Entry Invoices only if Batches is turned off in SO Options. When batches is turned on, the GL_CompanyActiveBatch ...by: Tracey B. | over a year ago | Last activity over a year ago | Status changed over a year ago | Integration
-
Votes
25
Paperless Viewer needs to show log of transactions from all ...
It appears that the only report to determine what has been sent successfully is from the daily invoice update. Duplicate invoices are sent from the customer master file ...by: Kim C. | over a year ago | Last activity over a year ago | Status changed over a year ago | General Enhancements
-
Votes
74
Make Grayed out fields readable
Since we upgraded from 3.71 all grayed out fields (eg Sales Order Number) are very difficult to read. Is there a way to make the grayed out fields darker to add back in ...by: Steve H. | over a year ago | Last activity over a year ago | Status changed over a year ago | General Enhancements
-
Votes
12
Provide ability to create new Ship To addresses for existing customers
We are often asked by our customers to ship to a location that is an existing customer and have to re-create the "Ship To" address when the information is already in the ...by: Steve H. | over a year ago | Last activity over a year ago | Status changed over a year ago | Sales & Distribution
-
Not Planned
20
MRP should recognize Bills with Options that are in Sales Order
Currently, the documentation indicates that "MRP does not consider Bill Options when running the generation process. Bill Options are not supported". This results in ...by: Karen M. | over a year ago | Last activity 7 months ago | Status changed over a year ago | Manufacturing
-
Votes
5
Inventory Reorder report
The Inventory Reorder Report should have decimal precision for quantities. Currently, only whole numbers display on the report. The worktable is populated with whole ...by: Karen M. | over a year ago | Last activity over a year ago | Status changed over a year ago | Reports / BI
-
Votes
1
Would like a warning in data entry if cost being entered exceeds the ...
An estimate is entered on a job by cost code. Would like a Warning in data entry that the estimate for the cost code will be exceeded if the data entry is updated.by: Karen M. | over a year ago | Last activity over a year ago | Status changed over a year ago | Sales & Distribution
-
Votes
3
Add Yield Percent to IM! or IM2
Some types of parts are subject to yield - a predictable portion on stock does not work in application. MRP would use this value to extend the result in ...by: Frank L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
4
Include on Qty On Hand prior to or resulting from transaction in IM5
Allows clear audit trail understanding - sequencing of transactions, etc.by: Frank L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
23
Include on To and From warehouse code for inventory transfer ...
Allows clear audit trail understanding - sequencing of transactions, etc.by: Frank L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Not Planned
7
Add floor stock item type for bulk issue material
Add item type to CI_Item, including floor stock for bulk issue material. Quantity on BOM should transact only cost, not inventory. MRP should project requirements by BOM ...by: Frank L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
10
Add inspection Required flag in IM
Add inspection required flag in IM. Requires receiving or in-process inspection accept quantity be entered before processing PO or WO or Production Entry receipts can ...by: Frank L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
6
Add zero change Cycle Counts to IM5
Retain zero change cycle count transactions in IM5 for inventory record accuracy measurement and reporting, and for last count date for scheduling based on ABC class. ...by: Frank L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
3
Bill of material cost roll Up should use last cost when procurement ...
We use bills of material in MAS for design control and communication with contract manufacturers when a bill is not assembled in house. In the same manner that MRP does ...by: Frank L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
16
The software should prevent us from using the same A/R invoice number ...
Allowing us to use existing a/r invoice multiple times (even for different customers) is creating problems.by: alan m. | over a year ago | Last activity over a year ago | Status changed over a year ago | Sales & Distribution

