• Votes

    22

    It would be helpful when numbering projects to be able to enter ...

    When entering a job in (3-5) it would be helpful to be able to use . or - , or even alpha numeric. That way the job could be revised but still use the main part of the ...
  • Votes

    6

    6-4-1 Change Order it would be great if we could print the "budget and ...

    making this an optional report to print would be great so that we can attached as a second page to the Change Order, to see break-down of Vendors/Sub-contracts and ...
  • Votes

    13

    Mandatory Fields Based on Job Status

    Project managers are often left responsible to enter job details, but the administrative staff are the ones who need them. It wastes a lot of time when the information ...
  • Votes

    22

    Multiple Phases On Purchase Orders

    Phases needed to be added to the grid so you can have more than one phase per purchase order.
  • Votes

    10

    The ability to assign a different department to each phase of a job

    I think it would be helpful if we could assign departments to a particular phase of a job, instead of only allowing 1 department to be selected in the main job window. ...
  • Votes

    3

    In 6-2 Budgets, be able to type directly into the Notes field

    Anyone manually entering budgets would want this. Right now, it pops-up the Notes Entry window, takes a second to update (slowing you down) and flash your screen, you ...
  • Votes

    9

    Allocate A/P invoice lines and Inventory Allocation lines to ...

    Currently, all job costs are created from the "job costs window". Unfortunately, the descriptions on the A/P invoice lines and inventory allocation lines have to be ...
  • Votes

    8

    disallow Duplicate change numbers

    Right now the system allows two changes with the exact same number within the same job and there is no way to prevent it. At least a warning might prevent some ...
  • Votes

    6

    Job Numbering

    It would be very very very useful if there was a notification when a job entry number is more than the next one available. As I have the next Job # 271 but there are ...
  • Votes

    9

    Warning when Sub- Change Order exceeds Budget

    It would be helpful if there was a warning indicating when a Sub Change order exceeds budgeted amount. Currently there is a warning if a subcontract exceeds budgeted ...
  • Votes

    3

    6-1-4-61 Allow filtering and sorting by supervisor (not just ...

    This report currently allows filtering and sorting by salesperson. I need to be able to filter and sort by supervisor. We use these 2 fields for foreman and project ...
  • Votes

    4

    Tolerance levels per costcode

    Home builders would need this. Sage 100 in need of a tolerance setting per cost code so that when we have a supplier with six different cost codes, that we can set a ...
  • Votes

    5

    Add Cost Code and Date Range to the 6-1-4-51 Report

    I need to be able to run a report that shows how much has been billed against a specific cost code during a specific date range in the 3-7 Progress Billings.
  • Votes

    5

    Subcontract Report that shows Approved Change Orders with the Sub

    Report 6-7-2 only has 2 options for subcontracts and it only shows the original bid. There should be a report that can be printed off that shows the base bid amount plus ...
  • Votes

    1

    6-1-4-61 job profitability report

    In the 6-1-4-61 , by client/job, the report shows jobs that are in the current year. For example, running the report for Jan 2017 through Dec 2017, it would also include ...
  • Votes

    17

    3-5 Jobs (Client Pop Up)

    We need a pop up when creating a job that depends on the client. Some clients have special requirements, safety training, MSHA vs OSHA hours, etc. It would be awesome if ...
  • Votes

    6

    Vendor list per project

    We just switched to Sage. We would like to produce a report for our field staff that lists each vendor (who we have entered in a PO or subcontract) PER PROJECT, with ...
  • Votes

    3

    Menu item 6-4-1 (change order editing after save)

    Change orders should be return to being editable after being saved as it was in version 19. The only way to edit in the new version is to copy, delete, paste and then ...
  • Votes

    11

    Export Budget from Takeoff based on Bid Item Types

    Need the ability to export budget based on specific bid item types (1 - base bid, 2-allowances, 3-Alternate, 4-Changes). If a project manager forgot to export the ...
  • Votes

    1

    Report Lines in Cost to Complete that have an Original Budget and ...

    When a Change Order is created that "zeroes out" a budget line, and there are no costs, that line no longer appears on the Cost to Complete screen (6-8-1.) Since this ...