-
Votes
3
Capability to maintain bill of material by warehouse (mfg plant) ...
Some multi-plant manufacturers need to maintain a different bill of materials at each location. For example, one plant has the capability to manufacture a subassemply in ...by: Steve P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
17
Select a specific Production Entry in BOM Disassembly
Add the ability to select a specific production entry in BOM disassembly. Once selected the items that were on the production entry would then default in disassembly ...by: Michelle L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
29
Upgrade the WOM to the newer file structure (like the other modules)
The work order module is delicate. Too many users in work order and/or too many component lines create long waiting periods for printing, posting and the error rate is ...by: Kathy G. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
5
Current Desc for Bill of Material when looking it up
On our Bills of Material, we put the formula numbers in them. Currently, if you look up Bills of Material, the description it provides is from the 000 (first) revision, ...by: Ron C. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Not Planned
29
Please make it easier to cancel a work order
Our work orders could have up to 200 component line items. Returning each line item with a negative issue entry is very time consuming. Then change WO entry to 0 qty, ...by: Kathy G. | over a year ago | Last activity over a year ago | Status changed 7 months ago | Manufacturing
-
Not Planned
16
Lot numbers should print on Work Order Travelers
A modified crystal form had to be created to print lot numbers on the traveler. The issue transactions forces you to assign lot numbers. This lot number must be used when ...by: Kathy G. | over a year ago | Last activity over a year ago | Status changed 7 months ago | Manufacturing
-
Votes
6
Change the Inventory Reorder report to give you an option to include ...
Change the Inventory Reorder report to give you an option to include issues, when you show usage. Currenlty only sales information shown. Great for a distributor, but ...by: Jim S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
20
Allow to enter multiple serial numbers at the same time in Inventory ...
The inventory adjustment entry allows to adjust only one serial number at a time. If I have to adjust a thousand serial numbers I have to go one at a time. The system ...by: KAMAL T. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Not Planned
51
Ability to re-open a Work Order
There should be a way to re-open a work order if it was closed accidentally. This can be an administrative feature or something where only an admin can re-open. ...by: Andrew M. | over a year ago | Last activity 11 months ago | Status changed 7 months ago | Manufacturing
-
Not Planned
23
Automatically create work order from sales order
If a "make" item is entered in a sales order, once "Accept" is clicked, have a pop up to ask if you want to automatically create a work order.by: Linda K. | over a year ago | Last activity over a year ago | Status changed 7 months ago | Manufacturing
-
Votes
10
When you run production entry out of BOM, have the inventory items ...
Want to be able to have the items in a bill pull from different warehouses in MAS. So, either allow us to assing the warehouse we want the item to pull from, or have it ...by: Pam V. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
2
Inventory Maintenance Import Images
On Version 4.1 when you Browse for a Item Image anywher on your Computer, the system will make a copy of the image in the mas90\Image\"Company Code" folder but on Version ...by: Payam M. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Not Planned
2
Work Order: quantity ordered generates cost rounding
This is a program bug. Quantity ordered on work order generates cost rounding issues in version 4.4 (it happens in all version). Steps to duplicate in XYZ 1. Expand ...by: Angela Z. | over a year ago | Last activity over a year ago | Status changed 7 months ago | Manufacturing
-
Not Planned
22
work order - enable editing once released
Once released you can't change anything in work order. So if a customer changes the rev letter, qty etc. you can't change in WOby: Phyllis D. | over a year ago | Last activity over a year ago | Status changed 7 months ago | Manufacturing
-
Votes
12
Allow a Phantom Bill to be a component of another Phantom Bill
Provides much more flexibility in manufacturing. Some subassemblies are stocked subassemblies while others are non-stocked subassemblies. In the BOM and WO modules you ...by: Steve P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
12
BOM- allow user to specify warehouse for components at BOM line item ...
BOM Maintenance should allow the user to specify a warehouse for each line item component. Currently we can only do that once the BOM Rev has been pulled into a WO.by: Geri R. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
7
Auto generate option for job numbers
It would be nice to have MAS90 be the point of creation of a job number from job costing module job maintenance. Even if it was optional for companies that don't see a ...by: Andrea J. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Not Planned
20
work order close transactions - select multiple work orders to close
Provide a selection screen for Work Order transaction entry - close transactions, similar to the AP check selection screen, where you can select all or use Shift-Click or ...by: Steve P. | over a year ago | Last activity over a year ago | Status changed 7 months ago | Manufacturing
-
Not Planned
10
option for work order scrap completions to not reduce qty to complete
Currently processing a scrap transaction reduces the qty to make on the work order. If we plan to make 10 units and complete 8 good units and complete 2 scrap units, the ...by: Steve P. | over a year ago | Last activity over a year ago | Status changed 7 months ago | Manufacturing
-
Not Planned
6
Work Order uses Average Cost of Warehouse to calculate Standard ...
Clients like to measure the difference between the standard and actual cost of a work order. Since the standard "planned" cost uses the average cost which in my view ...by: Avron K. | over a year ago | Last activity over a year ago | Status changed 7 months ago | Manufacturing

