Votes
20
Too many clicks to enter production or transactions
Consolodate all the production update options on one screen instead of an endless stream of pop-ups. It can sometimes take more then 20 clicks for me to update a ...by: James K. | over a year ago | Last activity 11 months ago | Status changed over a year ago | Manufacturing
-
Votes
12
Add ability to enter multiple production entries on the same screen.
To improve efficiency of data entry, add ability to enter multiple production entries on the same screen.by: Larry E. | over a year ago | Last activity 11 months ago | Status changed over a year ago | Manufacturing
-
Votes
6
Prodcution Management - Work Ticket Dissassembly
We are on Sage 100 2023 and using the PM module. We have started listing all materials within the WT Template instead of pulling them from a BOM. It would be helpful to ...by: Andrew M. | over a year ago | Last activity 11 months ago | Status changed over a year ago | Manufacturing
-
Votes
4
Add ability to copy Miscellaneous Charges from Bill of Materials to ...
Currently, when Copy From Bill of Materials is selected when creating a Work Ticket in Work Ticket Entry, the Miscellaneous Charges are removed. This is functioning the ...by: Karen M. | over a year ago | Last activity 11 months ago | Status changed over a year ago | Manufacturing
-
Votes
13
Recalculate Item History by ITEM
Add additional logic to the Recalculate Item History to be able to choose an item to recalculate, rather than doing it all.by: Mary M. | over a year ago | Last activity 11 months ago | Status changed over a year ago | Manufacturing
-
Votes
10
Increase field size of "Product Line Code" in Product Line Maintenance
Please increase the size allowed for the "product line code" in product line maintenance. 4 characters is way too small. I think it should be a minimum of 10 ...by: Kevin T. | over a year ago | Last activity 11 months ago | Status changed over a year ago | Manufacturing
-
Votes
4
Production management - when closing a work ticket, the inquiry screen ...
When a closing of work tickets are performed the following do not happen: 1) the closing register only shows the work ticket being closed with the parent item. The dollar ...by: Avron K. | over a year ago | Last activity 11 months ago | Status changed over a year ago | Manufacturing
-
Votes
4
Production management - when closing a work ticket, the inquiry screen ...
When a closing of work tickets are performed the following do not happen: 1) the closing register only shows the work ticket being closed with the parent item. The dollar ...by: Avron K. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
2
Add Batch Processing to Direct Time Entry
Add Batch Processing to Direct time entry.by: Tracy B. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
5
Production Management Work Ticket Totals tab should display Fixed and ...
Currently, Fixed and Variable Overhead are included in the total Labor, Material or Direct Cost. Detail is available on the Work Ticket Transaction Detail Report.by: Karen M. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
7
inventory cost
We are a manufacturer and use Standard Costing for processing transactions. However, it would be very useful if could at the same time maintain cost tiers for FIFO, or ...by: Barry P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
8
Bill of Materials Change Control
We attempted to implement Engineering Change Control in the Bill of Materials program. We would like to better document and control changes made to existing Bills of ...by: Barry P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Not Planned
3
The "quantity on purchase order" field should include all open ...
This field is shown in Inventory Item Maintenance/Inquiry and on the Inventory Reorder report. It is misleading to show the demand created by a work order or sales ...by: Jim S. | over a year ago | Last activity over a year ago | Status changed 6 months ago | Manufacturing
-
Votes
15
BOM requirements reports
Allow more than one person at a time to use the BOM Gross Requirements report or the Component Requirement Report.by: Lewis O. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
1
need to add an allocate and un-allocate option to the kit option to ...
need to add an allocate and un-allocate option to the kit option to keep track of inventory, and be able to make a (in production location) for such inventoryby: Cesar V. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
12
Item Memo to show up during receipt of goods
We have several items where something needs to be done before they can go into general inventory. Some items need to be verified by engineering, some items must be pre ...by: Joe Z. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Not Planned
4
MRP and Maximum Stock Level
Modification to MRP to use Maximum Stock Reorder Method when making reorder/make recommendations as it does on the Inventory Reorder Report. Currently MRP only recommends ...by: Dawn K. | over a year ago | Last activity about a year ago | Status changed 6 months ago | Manufacturing
-
Votes
3
Ability to create UDF to lot or serial number in production completion ...
With the Sage Production make to stock being the business framework replacement for work order we should be able to create a UDF to the lot or serial numbers during the ...by: Avron K. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
6
Create a function which allows for an Administrative election to not ...
In order to accurately track On Time Delivery of suppliers, it would be beneficial to "Lock" the PO Due Date when the PO is created; add a field for "Revised PO Due Date" ...by: Mari W. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
6
Allow a standard scrap % to be set on an item.
Allow a standard scrap % to be set on an item so that is is not overlooked in BOM. Like many, we cut extrusions to make products. We have a good idea of a standard ...by: Joe Z. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing