-
Votes
11
Product Supercession/Phase Out based on Stock Availability
Ability to switch to alternate materials based on stock availability. They don't want to change until they consume/use all of the existing product so a date trigger is ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
10
Option to have MRP to ignore certain on hold Sales Order
A lot of times, it could take days for sales department to finalize some Make-to-order orders with customers. It could be re-confirming the deliver date, price, or ...by: Michael T. | over a year ago | Last activity 4 months ago | Status changed over a year ago | Manufacturing
-
Votes
9
Miscellaneous Work Orders
Sometimes there are tasks to be done by some work centers that are not product related. It could be maintenance, or it could be a prototype run for the engineer. These ...by: Michael T. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
8
KANBAN Replenishment
Additional fields (number of containers, quantity per container, etc.) are required to support KANABAN processing. Additionally, a replenishment function that took these ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
8
BOM additions function
We need a function in X3 that is similar to the replace or delete component, but will add a new item to multiple BOMs based on a selection criteria. We have the case ...by: Lexi M. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
8
Manufacturing component substitution
Earlier version of Sage ERP X3 (pre-v6) had a feature that allowed you to define a list of substitute or replacement products on the product record. This list of ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
8
Scheduling: Concept of sequencing not considered
There are many industries that must do their scheduling in a particular sequence to minimize equipment clean ups and to avoid product contamination. This concept is not ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
7
Scheduling: Ability to define additional constraints for use by the ...
The graphical scheduler is a terrific tool but it needs to be more flexible in allowing the user to define additional constraints. Idea Origin: Sage Summit - C-0179 ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
6
delete production tracking
Prior to V6.5 patch 28 we could simply delete entire production tracking records with the press of the Delete button. Or we could delete individual lines by ...by: Glen G. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
6
BOM Maintenance - Screen Transaction Code Control
The BOM function in X3 supports many different business types and industries. Because of this the number of fields required during the entry of a component/ingredient ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
6
Crystal Report for the Assembly function
The Assembly (GESBBY) function does not have a crystal report that reflects what has been made and consumed based on the assembly operation. A report such as this would ...by: Kevin C. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
6
Scheduling: Consideration of allergen constraints in sequencing
In the food industry allergens can have a significant impact on how you manage and schedule your production facility. This is especially important is scheduling ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
5
Allow unexpected material more than ones on Work Orders just like ...
In X3 BOM's you have the ability to add the same item more than once based on routing sequence so paperwork can show how much is needed per operation. Yet on work orders ...by: gary f. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
5
Create a Work Order from a Sales Order and Maintain a Link
All manufacturers have situations where they need to run a job specifically for a customer’s order. This is true even for manufacturers who are not typically job shop. ...by: David P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
5
Customer Specific Product - Private Labeling
Would like a better way to manage customer specific products under a generic product ID. For example, they have a common hand soap that is private labeled for multiple ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
5
Firming up MRP result from Planning Workbench table (grid)
Currently to firm up MRP result on either Enterprise Planning or Planning Workbench, the user has to right click on the line and click to another function to create the ...by: Michael T. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
5
Validity Date for Part Number to Automatically Obsolete
Currently there's a validity date for BOM components. When Engineering phasing out a component with a replacement, they put a expected phase out date on the the "Valid ...by: Michael T. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
4
CRITICAL-MRP to take into account expire dates for Short Shelf Life ...
CRITICAL REQUIREMENT FOR THE FRESH FOODS INDUSTRY YOU ARE TRYING TO PENETRATE .... MRP not taking into account expiration date on POS – purchase order suggestions. The ...by: John V. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
4
Better overrall management of Multi-output Work Orders
It is possible to create a Work Order with multiple outputs, but there are a lot of shortcomings. For example, there is very little, if no possibilities of defining the ...by: Jean D. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
4
Multi-site cost roll-ups
When running a multi-plant environment, where sub-assemblies are prduced i na different site than the finished goods, the cost calculation process is quite arduous. You ...by: Jean D. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing