-
Votes
8
Scheduling: Concept of sequencing not considered
There are many industries that must do their scheduling in a particular sequence to minimize equipment clean ups and to avoid product contamination. This concept is not ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
6
Scheduling: Consideration of allergen constraints in sequencing
In the food industry allergens can have a significant impact on how you manage and schedule your production facility. This is especially important is scheduling ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
8
KANBAN Replenishment
Additional fields (number of containers, quantity per container, etc.) are required to support KANABAN processing. Additionally, a replenishment function that took these ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
11
Product Supercession/Phase Out based on Stock Availability
Ability to switch to alternate materials based on stock availability. They don't want to change until they consume/use all of the existing product so a date trigger is ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
4
Technical Sheets: Mass Validation Option
Technical sheets share the same questions and responses but are validated individually. If you change a shared elements (like a default response) you should be able to ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
2
Technical Sheets: Response Copy Option
When you have multiple work orders associated with the same batch (ex: pack out of bulk material), it would be very helpful if you could copy the technical sheet ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
2
Production Tracking: Ability to view work instructions from within ...
Ability to view routing or work instructions from within the tracking function is needed. Currently, the user has to open another or secondary session to view. Idea ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
7
Scheduling: Ability to define additional constraints for use by the ...
The graphical scheduler is a terrific tool but it needs to be more flexible in allowing the user to define additional constraints. Idea Origin: Sage Summit - C-0179 ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
1
Scheduling: Ability to schedule a work center by person and shift
Scheduling should allow a work center to be scheduled by person and shift. This would allow for the management of machine operators. In addition to the operator and ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
2
ADC transactions -- change order of entry
ADC transaction entry doesn't follow a logical sequence -- drilling down from field to field from general to specific. Looking at the transactions in ADC, it would seem ...by: Karen E. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
1
Enhance Multi-level routings screen to include online help
The Manufacturing > Technical data > Routings > Multi-level routings screen (VISUROUG) does not contain any help. Please enhance the screen to include help.by: Bob D. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
10
Option to have MRP to ignore certain on hold Sales Order
A lot of times, it could take days for sales department to finalize some Make-to-order orders with customers. It could be re-confirming the deliver date, price, or ...by: Michael T. | over a year ago | Last activity 4 months ago | Status changed over a year ago | Manufacturing
-
Votes
9
Miscellaneous Work Orders
Sometimes there are tasks to be done by some work centers that are not product related. It could be maintenance, or it could be a prototype run for the engineer. These ...by: Michael T. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
21
ability to deactivate work center
There needs to be a way of marking a Work Center as inactive. The only way to prohibit a user from not using a work center on a routing is if it doesn't exist. If we've ...by: Lexi M. | over a year ago | Last activity 4 months ago | Status changed over a year ago | Manufacturing
-
Votes
5
Validity Date for Part Number to Automatically Obsolete
Currently there's a validity date for BOM components. When Engineering phasing out a component with a replacement, they put a expected phase out date on the the "Valid ...by: Michael T. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
12
Add an MSDS module or MSDS capabilities to Sage ERP X3
Would like to be able to create MSDS technical sheets and have other capabilities. One recommendation is to somehow integrate the Sage PFW MSDS module with Sage ERP X3.by: Lynne A. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
6
BOM Maintenance - Screen Transaction Code Control
The BOM function in X3 supports many different business types and industries. Because of this the number of fields required during the entry of a component/ingredient ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
16
Easier Way to Update Work Order Components/Routing
When a work order is created, the system takes the BOM and Routing at the time, and put on the work order. However, sometime the BOM/routing got changed before the Work ...by: Michael T. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
5
Firming up MRP result from Planning Workbench table (grid)
Currently to firm up MRP result on either Enterprise Planning or Planning Workbench, the user has to right click on the line and click to another function to create the ...by: Michael T. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
1
Remove control on total link quantity for By-products in BOM expressed ...
If a BOM is expressed as a %, there is a control in place to avoid entering the total link quantity greater than 100%. However, this control also includes any ...by: Jean D. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing