• Votes

    4

    Add ability to copy Miscellaneous Charges from Bill of Materials to ...

    Currently, when Copy From Bill of Materials is selected when creating a Work Ticket in Work Ticket Entry, the Miscellaneous Charges are removed. This is functioning the ...
  • Votes

    3

    Cost Register Roll-Up option to exclude purchased parts.

    When running the Cost Register Roll-up, purchased parts that have BOMs are automatically included in the update. This forces you to remove BOMs from purchased parts even ...
  • Votes

    4

    Change Serial Number Format

    How about an option to change how the Production Entry serial number format is laid out. If I want to have a serial # with Letters designating the facility where ...
  • Votes

    13

    Recalculate Item History by ITEM

    Add additional logic to the Recalculate Item History to be able to choose an item to recalculate, rather than doing it all.
  • Not Planned

    3

    Enable sort functionality in Production Management Work Ticket ...

    Users need to be able to sort the lines in work ticket transaction entry. For example, work tickets can be elected to print by item number rather than order entry. When ...
  • Votes

    5

    Allow steps in Phantom bills

    WO (and now Production Management v2022) does not allow Step Numbers to be entered in Bill of Materials when the bill is a phantom. If you add a standard bill as a ...
  • Votes

    6

    Create a function which allows for an Administrative election to not ...

    In order to accurately track On Time Delivery of suppliers, it would be beneficial to "Lock" the PO Due Date when the PO is created; add a field for "Revised PO Due Date" ...
  • Votes

    6

    Allow a standard scrap % to be set on an item.

    Allow a standard scrap % to be set on an item so that is is not overlooked in BOM. Like many, we cut extrusions to make products. We have a good idea of a standard ...
  • Votes

    9

    delete bill of materials utility

    A utility should be added to Bill of Material that will allow one to delete a bill of material or a range of bill of materials. Currently this is not possible and clients ...
  • Votes

    15

    Need a function to replace BOM components on a range of BOMs

    Add the ability in the 'Relace and Delete Component Entry' to select item by a range of BOMs. This would help when there is a multiple to one ratio of components instead ...
  • Votes

    15

    Store a different standard cost by warehouse

    Many manufacturers have different production costs for an item based on the plant location where the production is done. Component costs may differ widely for different ...
  • Votes

    9

    extended item descriptions in BOM

    the option to have the extended item description in the BOM
  • Votes

    6

    W/O cost roll up register should reference a quantity when addressing ...

    If operations on a routing are of the LOT type and standard costing is being used, the W/O cost roll up register assumes a work order quantity of 1. This causes labor ...
  • Votes

    5

    Add totals of all warehouses to inventory inquiry screen, qty on hand, ...

    In I/M inquiry I would like to see what the total qty on hand, PO, SO, etc is for all warehouses. Can we add a totals row to the bottom of the grid?
  • Votes

    12

    Change the backorder status of PO to Incomplete

    Much confusion arises between a PO status of back order versus a backorder quantity on PO. A PO can have a backorder status if a receipt of goods but no invoice has been ...
  • Not Planned

    2

    Reschedule checkbox for work orders

    There is an MRP reschedule field for Purchase Order lines. There should also be a reschedule field for work order material lines. Reschedule (for PO lines) Select this ...
  • Votes

    2

    Ability to enter retention rate or amount in PO Receipt of Invoice

    Add retention rate and retention amount in PO Receipt of Invoice. This eliminates a second step of going into AP Invoice data entry to adjust the invoice in order to get ...
  • Votes

    4

    The ability to go to BOM from Item Maintenance when entering a new ...

    Right now you can go to BOM when in Item Maintenance but only for existing items with kits. It would be great to be able to go to BOM directly from Item Maintenance when ...
  • Not Planned

    5

    WO Zero Quantity Warning

    It would be helpful to display a warning if trying to complete a work order at quantity zero, similar to the one that is shown if you try to complete it for a quantity ...
  • Votes

    4

    explode subassemblies default should come from the BOM item

    The explode subassemblies option should be controlled at the BOM level. Some make items always explode subassemblies while other make items DO NOT explode subassemblies - ...